Good Morning Framing

Wood framing for Edmonton multiplexes.

Main framing, backframing and window installation, with heat-hole cutouts and framing cleanout.

Have ready: your PDF plans and estimated start dates.

The three-storey Granville fourplex during framing. Its gable end, wrapped in yellow exterior sheathing, glows in low sun under a clear blue sky.
The Granville fourplex. Exterior sheathing.

Our work / Granville fourplex

From floor framing to a building taking shape.

A practical look at the structure behind a multiplex.

A framed main floor seen from a drone: sheathed walls with window openings, subfloor decking and exposed floor joists, with a line of trees behind. Enlarge this photo
Wall and floor framing.
Looking straight down on the fourplex floor system: rows of joists and wall studs, sheets of subfloor decking and open stairwells. Enlarge this photo
Floor joists, openings and decking.
Two neighbouring multiplex floors from directly above, one decked and one still open to its joists, with lumber staged between them. Enlarge this photo
Site-wide framing progress.

These photos show GMF’s work on the Granville fourplex: framed walls, floor systems, decking and exterior sheathing.

Explore the project gallery

What we do

Framing scope, made clear.

Labour-only framing, or materials coordinated by GMF. We’ll confirm the scope for your project.

  • Main framing
  • Backframing
  • Window installation
  • Heat-hole cutouts
  • Framing cleanout

For builders & project owners

Have prints ready?

Send your PDF plans and estimated start dates to start an estimate.

Request an estimate

Looking for framing work?

Build your craft with us.

Tell us what you can do and what you’re ready to learn.

Join the crew